أسئلة وأجوبة
أسئلة وأجوبة
8 متاح 8 • عرض الجميعCivil claim against a contractor for delay in house renovation

6
Q: Hello,
My husband and I awarded one of Dubai's contractors to do renovation in our apartment. We paid him 50% in advance according to the contract signed between us.
We paid another 20% after some time in response to his request to have an additional amount to buy the materials.
The renovation was supposed to be completed in one month, yet, 2 months and a half already passed and the contractor has not even bought the material he promised (tiles, sanitary-ware... etc.).
He promises but not delivering, postponing payments in all possible ways. Suppliers of the materials confirmed that payments had not been made by the contractor.
We have a clause of damage liquidating (contractor needs to pay 1000 AED/day), but he doesn't seem to take it seriously.
What is the best way to deal with this problem?
If we take him to court, how much do we need to pay for the file opening?
What damages he will experience - license termination?
How quick can we have the money back?
BR, J.


2020/12/30
1754
المطالبة باسترداد الأموال المدفوعة للمقاولين لتخلفهم عن أداء التزاماتهم


2
س: أريد رفع قضية في إمارة دبي ضد شركة عقارية.
كان من المفترض أن يبنوا لي فيلا في مراكش، بالمغرب. لكن لم يحدث أي شيء رغم مرور خمس سنوات. لقد دفعت 200,000 دولار حتى الآن وأريد استرداد أموالي.
يرجى تقديم المشورة.
شكرًا لك.



2021/09/05
460
خرق العقد مع المطور العقاري ورفع قضية بسبب التأخير في التسليم



1
س: عزيزي المحامي،
إننا 18 مالك لدينا أرض تبلغ مساحتها 200 ياردة، أبرم كلٍ منا اتفاقية بناء مع مطور عقاري في 02/2014.
وكانت الشروط تنص على أن المطور العقاري يمكنه ضمن حصته 50:50 بناء الشقق وبيعها. ولكن مع تقديم معدل تراكمي تم الحصول عليه بالاحتيال، لقد مر 18 شهرًا وفترة سماح مدتها ستة أشهر على الموعد المقرر لاستكمال البناء وتسليم الشقق مفروشة بالكامل.
في حالة التأخير، يجب دفع إيجار قيمته 6000 في الشهر وثلاثة الآف وديعة قابلة للاسترداد لكل مالك وحدة.
لم يسلم المطور العقاري الشقق (60٪ مبنية) ولم يدفع الإيجار أو الوديعة التي تبلغ قيمتها ثلاثة الآف. عدادات الكهرباء باسمنا وكلنا ندفع الحد الأدنى من الرسوم.
لا يرد المطور العقاري على مكالماتنا الهاتفية ولا يحضر الاجتماعات كلما طلبنا منه ذلك. لقد باع المطور العقاري حصته من الشقق.
يرجى تقديم المشورة بشأن الخيار الأفضل بالنسبة لنا.
ل.




2021/09/14
549
المقاول الرئيسي لا يدفع المبلغ المستحق. ما الذي يجب القيام به؟


1
س: سيدي العزيز / سيدتي العزيزة،
نحن شركة مقرها دبي. لقد التزمنا مع المقاول الرئيسي للمشروع. لقد أنجزنا العمل لكنه دفع 25% فقط من القيمة الكاملة.
لم يتم دفع المبلغ المتبقي. ماذا علينا أن نفعل للحصول على مستحقاتنا؟



2022/08/02
436
المقاول لا يسلم أعمال التجديد كما هو متفق عليه. ماذا أفعل؟



6
س: سيدي/سيدتي،
لقد استأجرت مقاولاً لتجديد فيلتي في ميدوز، دبي في أبريل 2022. فريق المقاول ليس سليمًا من الناحية الفنية، ويجب العمل على كل شيء مرتين إلى ثلاث مرات على الأقل لتصحيحه.
هناك عيوب هيكلية في عمل فريقه؛ على سبيل المثال، العمود الخرساني الذي صنعوه لدعم الهيكل كان معيبًا. فريقه بالكامل في الموقع أميون (بمعنى أنهم لا يستطيعون القراءة والكتابة باللغة الإنجليزية) بما في ذلك مدير المشروع.
لقد كنت أنا وزوجي ندير المشاريع لإبقاء الأمور مستمرة خلال الأشهر الأربعة الماضية. بناءً على عقدنا، حصل على المزيد من العمل داخل مجتمع ميدوز، ولا يعير عملنا الانتباه الآن.
لقد ساءت الأمور من سيء إلى أسوأ. تأخرت العملية برمتها لأكثر من 4 أشهر. لقد سئمنا منه.
بالمناسبة، العقد الذي وقعه الطرفان مكتوب بشكل فضفاض.
يرجى إفادتنا بالطرق القانونية المتاحة لنا في هذه الحالة.
شكرًا جزيلاً.




2023/01/03
1109
Filing a complaint against a contractor for a faulty swimming pool



1
Q: Dear Sir/Madam,
How can we file a complaint against a contractor?
Our swimming pool was completed in October and has been leaking ever since. They have attempted to repair it twice, but it is still leaking.
We have sent them a letter stating that we are terminating the contract because they are unable to complete the work to an acceptable standard.
What should be our next step?




2023/04/05
141
Dealing with a pool contractor who used faulty materials causing leak?

1
Q: Dear Sir/Madam,
I am looking for some advice.
Twelve months ago, we hired a contractor to install a concrete pool. To date, we haven't been able to use the pool due to a leak. They keep trying to "fix" it, but I have no confidence in them anymore.
Last week, another contractor came to the villa to look at it testing some of the fittings that I thought could be the reason. He removed some of the fittings and gave me a gut-wrenching comment.
The concrete used for the pool is, in his opinion, "not good."
What course of action can I take now?
I obviously need to get the pool fixed, but I'm assuming the contractor won't accept liability.
Can I involve the DM (Department of Municipality)?


2023/04/30
100
How can I get a refund from a contractor who failed to complete renovation work in Dubai?

0
Q: How can I get a refund from a contractor who failed to complete renovation work in Dubai?
The contractor agreed to refund but he isn’t transferring the money. He is just dragging me around with fake promises.


2025/03/24
65
قوانين وتشريعات
1 متاح 1 • عرض الجميعFederal Law No. (5) of 1985 On the Civil Transactions Law of the United Arab Emirates 96
The provisions of this law, promulgating UAE Civil Code, govern the civil transactions in the United Arab Emirates. The commercial transactions remain subject to the laws and regulations applicable in their regard.
1985/12/15
148365

متميز
إجابة أخرى من
3186 3186 إجابات •
عرض الجميعHow can I cancel my current visa immediately without serving notice? 0
Hello,
I got an offer letter from another company. I want the immediate cancellation paper before 20th April.
I don't have time to submit my notice period registration. What should I do?
Please give me the best advice!
2025/04/04
84
During the notice period, is an employee allowed to take sick leave? 0
Hello,
During the notice period, is an employee allowed to take sick leave? If not, can the employer deduct the sick leave from the employee’s end-of-service benefits?
Additionally, what is the legal basis for this? Specifically, which law or ministerial decision governs this matter?
2025/04/04
136
Can I request reopening a civil case if the judgment was in my absence due to sending notices to the wrong address? 0
Lawyers misunderstood my question. Please read carefully and then guide me.
Case Type: Civil Case
Claim amount: 400,000
Paid: 65,000
Reason: Commercial agreement of supply
Emirate: Ajman
This case was registered in 2022. The judgment was in my absence, as notices were sent to the wrong address.
I was sent to jail. I made a down payment, bailed, and paid some more amount as installments. The total paid amount is AED 65000.
Now, again, an arrest warrant is issued as I did not pay the remaining 335,000 of the claim.
According to me, I had to pay only this amount because the executioner made a wrong claim, not as per the genuine claim.
So I want to reopen the case file.
I want the court to reinvestigate and start the case from scratch.
1) How can I make that request?
2) What documents are required?
3) Chances of reopening of case?
4) Cancellation of arrest warrant
Please guide me in detail, as I will do everything myself, as I cannot afford a lawyer right now.
2025/04/04
72
I booked a hotel stay for Eid through a travel agency and it was canceled two days before Eid. What to do? 0
I booked a hotel stay for Eid through a travel agency two weeks before Eid. The travel agency confirmed the booking on payment.
One day before Eid, the agency reached out, saying they had an issue with the supplier/hotel and the booking would be cancelled.
They offered alternative hotels that didn’t match the original property. I suggested some properties, and they couldn’t arrange them, or they asked for further payment, so I didn’t book anything through them.
What are my rights to a refund and compensation, as I had to book other arrangements separately at a significantly higher cost due to the last-minute prices?
It also caused significant emotional distress, less than 24 hours before the holiday. To which authority can a complaint be made in case of an unsatisfactory outcome?
Both the agency and the hotel are in Dubai.
2025/04/04
64
How can I renew my Ejari if the landlord hasn’t signed the new contract? 0
Hi,
I have been here for 3 years now and paid the increased amount (as per the agreement) for the 4th year.
However, the landlord did not send me back the signed contract, although I have both made the payment for the full year via bank transfer and sent my signed contract to him.
I need to renew my Ejari; however, how can I do it without the landlord's signature?
I have all the previous contracts signed by both parties, along with the Ejari for those contracts.
2025/04/14
2
احصل على عروض أسعار من محامين
ابحث عن المحامي المناسب لاحتياجاتك القانونية.
أرسل طلبك واحصل على عدة
عروض تنافسية من
محامين مؤهلين.
أسئلة شائعة
عرض الجميع هل تبحث عن شيء آخر؟
اطلب استشارة من محامٍ