Suing an engineering consultant for the delay of service delivery

Dear sir/madam,

We have an issue related to service delivery with an engineering consultant in Dubai. This is related to the construction of a villa in Riyadh, KSA.

The contract required them to provide us with detailed design services related to a project which included the MEP, facade, landscape detailed drawings, and tender documentation for submission to the contractor to construct the project.

Chronology of events:

- Contract signed: 19th March 2021

- Concept design documents submitted to OMTO to start their work: 29th June 2021

- MEP package received: 27th July 2021 (was promised delivery in 10 days, they took nearly 30 days)

- Full MEP and schematic design documents received from OMTO: 27th August 2021 (4 weeks late)

- Approval and payment made to proceed to detail design stage: 8th November 2021

- Detailed design package received: 2nd January 2021 (4 weeks late)

We wish to sue them for the delays and losses incurred by us.

إم آي أو (أبو بكر سالم للمحاماة والاستشارات القانونية)
دردشة
توظيف
اجتماع
25 Jan 2022, 09:20

مرحبًا،

بناءً على استفسارك، يرجى ملاحظة أنه بالنسبة للتأخير والخسائر، يجب أن تكون هناك قضية مدنية يجب رفعها أمام محكمة دبي.

ومع ذلك، نحتاج إلى مراجعة شروط العقد، والاختصاص القضائي، وتقدير التأخير، والمستندات الأخرى ذات الصلة، لمعرفة مدى الأحقية في القضية.

يرجى الاتصال بنا عبر الهاتف أو البريد الإلكتروني.

خدمات برسوم ثابتة
1 1 خدمة متاحة •  عرض الجميع
احصل على عروض أسعار من محامين
ابحث عن المحامي المناسب لاحتياجاتك القانونية. أرسل طلبك واحصل على عدة عروض تنافسية من محامين مؤهلين.
هل تبحث عن شيء آخر؟
اطلب استشارة من محامٍ
الخدمة مجانية وهويتك مخفاة
لا حاجة للتسجيل
اسأل محاميًا